Latest Posts

Stay in Touch With Us

Got a story worth telling? Send it our way. We read every tip that lands in our inbox.

Livebriefs

  /  All News   /  Dermody Adding 1.2M-SF to El Mirage Industrial Venture

Dermody Adding 1.2M-SF to El Mirage Industrial Venture

Dermody will begin construction on Buildings 3 and 4 at LogistiCenter at Copperwing in El Mirage, Arizona, with delivery estimated for the third quarter of 2027. 

Building 3 totals 693,760 square feet and Building 4 totals 520,170 SF. Together, the two buildings total 1,213,930 square feet and are designed to be combined into a single building totaling 1,319,962 SF. The buildings are located approximately 27 minutes from TSMC’s Phoenix-area campus and within an approved Foreign Trade Zone. 

The news of the two new buildings follows Dermody’s full lease-up of Building 6 (284,421 square feet) at LogistiCenter at Copperwing, stabilizing the development’s first phase.

With Building 6 fully leased, Buildings 3 and 4 will represent the second phase of LogistiCenter at Copperwing, a 961-acre master-planned industrial park with capacity for more than 7 million square feet of distribution space. Dermody was represented by Pat Feeney, Dan Calihan, and Tyler Vowels of CBRE.

The post Dermody Adding 1.2M-SF to El Mirage Industrial Venture appeared first on Connect CRE.

​  

You don't have permission to register